Downtown has a great many urban living apartment options. The following is a list of apartment projects in Downtown. This is a truncated list and does not include dedicated government housing, or smaller home conversions. Apartments.com is a great tool for checking out apartments. Many of the listings have a virtual 360° tour and a range of rents.
Lower Downtown & South Main District:
- Normandy Apartments, 3 floors, mid-century
- Smith Tower, 15 floors built in 1966, seniors over 62
- Evergreen Hotel, 5 floors built in 1927, seniors, assisted living
- Lewis and Clark Plaza, 4 floors, renovated in the 2000’s, income restrictions
- Esther Short Commons, 5 floors, ground retail, built in 2005, income restrictions
- The Aria, 7 floors, built in 2021
- Jefferson Street Apartments, 4 floors, built in 2022 income restrictions
- Vancouver Center 1, 6 floors, underground parking, built in 2004
- Beverly Court, 2 floors, pre-war brick
- Vancouver Center 4, 7 floors, built in 2020
- Riverview Tower Apartments 5th and 6th floor only built in 1992
- Block Ten Holland Apartments (not on map just under #11) 7 floors built in 2022
- Adera Apartments (not on map) 6 floors under construction.
Upper Downtown & Government District:
- Van Vista, 10 floors, built in 1971, seniors over 55
- 13 West, 5 floors, built in 2015
- 15 West, 5 floors, built in 2014
- Kirkland Union Plaza, 4 floors, built in 2000s, seniors over 62
- Fontana Court, 3 floors, mid-century
- Aegis at the Academy, 5 & 6 floors, under construction
- Prestige Plaza, 4 floors, built in 2000s
- The Hudson, 3 floors, mid-century converted hotel
- Our Heroes Place, Dollie Tower 5 floors, built in 2020
- Our Heroes Place, Ed Tower 5 floors, built in 2019 (next to #9)
- Angelo Mill Plain II, 6 floors, mixed use, (not on map just above #7)
- Tinkerton Lofts, 3 floors, not on map built in 2020
- Miles Terrace, 4 floors (not on map above #3) built in 2022
- 1500 Block, 7 floors mixed use, proposed
- 13th and Broadway, 7 floors, proposed
#VancouverUSA #Portland #Apartments